Welcome to KGC Engineering Projects. Your Partner in Precision Engineering & Fabrication

Gussing Renewables

Gussing project

Project Overview

Client: Güssing Renewables Energy, Austria

Location: Nakhon Sawan Province, Thailand

Güssing Renewables Energy Thailand together with key partners in Thailand, Siam Cement Group, Metro Machinery Co., Ltd., Bangkok Industrial Gas Co., Ltd., Cofely (Thailand) Co., Ltd. and Nongbua Green Power Co., Ltd. are putting up the first GRE-Dual Fluidized Bed Gasification Power Plant in Thailand. The plant is located north of the country's capital Bangkok in the province of Nakhon Sawan.

The GRE DFB gasification system is the world's first functioning FICFB (Fast Internally Circulating Fluidized Bed) plant. The core of the plant is formed by the two inter-connected fluidized bed systems of the fluidized bed steam gasifier (reactor).

KGC was awarded the contract of manufacturing critical components of the GRE-Dual Fluidized Bed Gasification system, which included the Gasifier, Combustion Chamber, Cyclones and Inter Connecting Ducts. Upon manufacturing of components, a mock assembly of all components was done to ensure systematical erection and assembly of components on site. The activity involved fabrication of structurals, erected on civil Foundations designed and constructed to withstand actual load conditions.

Key Deliverables

  • Gasifier (Fluidized Bed Steam Gasifier)
  • Combustion Chamber
  • Cyclones for gas separation
  • Inter Connecting Ducts
  • Mock assembly of all components before shipment
  • Structural fabrications for site erection

Industry Sector

  • Gasification

System Provider

  • Gussing Renewable Energy

Inspection

  • TUV Sud

Gallery

Gussing 1
Gussing 2
Gussing 3

Project Facts

  • Location: Nakhon Sawan, Thailand
  • Client: Güssing Renewables Energy, Austria
  • Technology: FICFB Dual Fluidized Bed Gasification
  • Equipment: Gasifier, Combustion Chamber, Cyclones, Ducts
  • Special Process: Mock assembly before shipment
  • Inspection: TUV Sud

Key Achievement

Successfully manufactured critical components for the world's first functioning FICFB gasification plant, including complete mock assembly and structural fabrication for on-site erection.

Contact for Similar Projects

Reach out for gasification and renewable energy equipment solutions.

Get in touch

Need Equipment For Renewable Energy Projects?
We Deliver TUV Sud Certified Gasification Solutions.